Shift:
Day In Next Day Out Mon 1:30 PM 12:00 AM Tue 1:30 PM 12:00 AM Wed 1:30 PM 12:00 AM Thur 1:30 PM 12:00 AM Summary Summary: This position requires scanning of Source Plasma units and removal of unsuitable units utilizing the Plasma Management System (SGP). Functions are performed according to specific Standard Operating Procedures, quality, and safety standards and insuring accuracy. A visual inspection of plasma units is also performed, to remove any units which are unacceptable for further manufacturing (e.g. damaged, broken port/tube, RBC, or removal rejections). Throughput standards and schedule targets should be met consistently.